Well, it will be if I can upload pix. My DSL isn’t the best right now so uploading pix takes forever if at all.

This is the first floor porch looking into the first floor. We have it partially frames and some temporary decking in place. My back is still celebrating because I don’t have to crawl on my hands and knees to get past the batter boards. Next is overall progress. On the second floor you can see the start of the framing for the roof. All of the 4×4 posts will be capped with a double row of 2×4 which will support the framing as well as add about three inches of height. The second floor porch isn’t framed as yet.
If you are interested in seeing more detail just click on the thumbnails in any post. This will take you to a larger image. Click it again for a giant image. Use your browser back button to return to the post.
First floor looking out to front porch. Right now the floor is a single
sheet of 3/4 inch plywood. A sheet of 1/2 inch will be added for insulation, sound deadening and stiffness. We’re using nails, screws and liquid nails so the floor is really tight.
Added foundations. In all there will be ten of these with ten to twelve bags of concrete each. The post footers (yellow tubes) have
about five bags each so each foundation weighs a total of about 1600 to 2000 pounds each. I have to admit that I wasn’t really sold on these at first but now I like the idea. In time I may build new forms and encase the footers even higher up.
After crunching numbers I’ve realized that cash is starting to look thin. I have most of the material needed to finish the shed and most everything necessary to make it habitable. I still have to add a well and solar power. The well will be a fairly low dollar eater but I’ve had to scale back the solar plans quite a bit. Since my power needs are going to be minimal this won’t be a major headache.
With this in mind my new priorities are finish the first floor porch stairs, finish framing and laying the deck on the porch and sheath the first floor. I’ve already bought windows so they will go in while we’re putting up the plywood for the exterior walls. Due to height restrictions the doors are oddball sizes so they will have to be built on site. No biggie. I hope to spend this weekend in my new pole barn and start working out the kinks of living totally off grid.